From enquiry to aftercare — a clear process

Last updated: 11 November 2026 · Reviewed by the Scottish Energy Efficiency team

Solar installation team fitting panels on a Scottish rooftop

Quick answer: Step 1: Enquiry — tell us what you want. Step 2: No-obligation survey — we assess your home, roof and energy use. Step 3: DNO and design — we handle G98/G99 paperwork with SP Energy Networks or SSEN. Step 4: Install — our MCS-certified installer partners fit your system, typically 1-3 days. Step 5: Handover and aftercare — MCS certification, handover pack, ongoing support.

What happens from enquiry to aftercare?

Step 1: Enquiry — tell us what you want. Step 2: No-obligation survey — we assess your home, roof, energy use and give exact figures. Step 3: DNO and design — we handle G98/G99 paperwork with SP Energy Networks or SSEN. Step 4: Install — our MCS-certified installer partners fit your system, typically 1-3 days on site. Step 5: Handover and aftercare — MCS certification, handover pack, and ongoing support. We handle conservation area checks, listed building consent, tenement co-owner consent. A named contact throughout. We install through MCS-certified partners.

What happens at the enquiry stage?

You tell us what you want — solar panels, battery storage, a heat pump, insulation, or a combination. Call 0141 230 0198 or fill in our online quote form. We ask about your home type, what you want to achieve, and your budget. There is no obligation and no pressure.

We use this information to determine whether a no-obligation survey is the right next step. If your home is clearly unsuitable — for example, heavily shaded or with a roof that cannot support panels — we will tell you upfront rather than waste your time with a survey.

What does the no-obligation survey involve?

A surveyor visits your home to assess roof orientation, pitch, shading, structural condition, energy use and heating system. The survey takes 45-60 minutes. You receive exact figures — system size, expected generation, cost and timeline — not vague estimates.

The surveyor also checks planning requirements, conservation area status, listed building consent needs, and DNO notification requirements. For tenement flats, we assess co-owner consent requirements under the Tenements (Scotland) Act. There is no charge for the survey and no obligation to proceed.

How does the DNO and design stage work?

After the survey, we design your system and handle all DNO paperwork. For systems up to 3.68kW per phase, a G98 notification is filed with SP Energy Networks or SSEN within 28 days of installation. For larger systems, G99 prior approval is obtained before installation begins.

The design stage also includes panel layout, inverter selection, battery sizing (if applicable), and structural calculations. You receive a written proposal with a fixed price. We install through MCS-certified partners — the installer partner is introduced at this stage.

What happens during installation?

Our MCS-certified installer partners fit your system, typically over 1-3 days on site depending on system size and complexity. The process includes scaffolding or safe access, roof preparation, panel mounting, inverter installation, battery installation (if applicable), and electrical connection.

We minimise disruption and keep you informed throughout. The installer partner cleans up after installation and walks you through the system on completion. MCS certification is issued after installation, and you receive a handover pack with all documentation.

What happens at handover and aftercare?

At handover, you receive an MCS certificate, warranty documentation, monitoring app setup, and a handover pack explaining how your system works. We are available for questions after installation — a named contact handles your account throughout.

If something is not right, contact us and we will work to resolve it with the installer partner. You can also contact Citizens Advice for consumer advice. We install through MCS-certified partners and every installation is MCS-certified.

How long does the whole process take?

From enquiry to installation typically takes 2-6 weeks depending on system complexity, DNO approval times, and installer partner availability. G99 approval for larger systems can take longer. We give you a clear timeline at the survey stage.

Conservation area checks, listed building consent and tenement co-owner consent can add time. We handle all of this for you and keep you informed of progress. Call 0141 230 0198 to start the process.

You can read more on our sister sites: solar costs, savings and export payments; home battery storage systems; interest-free monthly payments for solar and battery. Part of the Scottish Energy Efficiency network.

Key facts for Scotland

  • The process has five steps: enquiry, no-obligation survey, DNO and design, install, handover and aftercare.
  • The no-obligation survey takes 45-60 minutes and gives you exact figures.
  • We handle G98/G99 DNO notifications with SP Energy Networks or SSEN.
  • Installation typically takes 1-3 days on site depending on system size.
  • You receive an MCS certificate and handover pack after installation.
  • Interest-free credit up to £30,000 is available, subject to status.

Frequently asked questions

Can I add a battery to existing solar panels?

Yes, in most cases. A retrofit battery can be AC-coupled or DC-coupled depending on your setup. A no-obligation survey determines compatibility and the most suitable approach.

Is finance available for solar and battery installations?

Interest-free credit up to £30,000 is available, subject to status and affordability. Terms and conditions apply. Any finance is arranged and provided by our authorised partners, not by Scottish Energy Efficiency.

How do I get a quote?

Call us on 0141 230 0198 or fill in our online quote form. We arrange a no-obligation survey, then send you a written quote with no pressure.